The AEC Associates Architectural Drafting and Design services constantly strives hard to conceptualize brilliant, innovative designs with the objective to translate the aspirations of their clients into functionally efficient and aesthetically pleasing buildings. Design is an ongoing process and often there are changes even after final drawings are prepared, and also during the construction stage sometimes; this may cause confusions that Architectural drafting and design professionals find difficult to handle. The building cost has skyrocketed in the recent years and it’s best to ensure that there should be little or no difference between the final set of drawings and the end-product; however, avoiding this mismatch is simply not possible sometimes for various reasons.

Importance Of As-Built Drawings For Architectural Drafting And Design Professionals
Minimizing the difference between working drawings and final structure:
It’s very important for Architectural drafting and design services to minimize this difference to keep the losses at a bare minimum and maintain their own reputation; that’s why as-built drawings assume a great significance. The AEC industry professionals understand the importance and utility of this type of documentation, even though the clients may not yet realize their full value. As mentioned earlier, a design necessarily undergoes some changes, sometimes quite substantially, due to various factors even after the final drawings are prepared and construction starts; this makes the as-built drawing documentation a necessity.
Producing as-built drawing documentation:
As-built drawings enable Architectural drafting and design professionals to predict the final outcome in a more accurate manner and give the clients a true picture of the end-result. Creation of an as-built set is not at all a complex job, it’s done the same way as a construction documents (CD) set is produced. The marked-up PDFs of CD sets are used to make alterations in the CAD files of these CD sets in accordance with the changes made/ planned. The accuracy of the information in title block and about the alterations effected is mandatory.