3 Things CAD BIM Services Should Do Well To Ensure Efficient Project Management
The system employed by top providers of CAD BIM services like The AEC Associates is far more efficient and productive than any other existing building model. This system provides a more holistic overview of the project that allows CAD BIM services professionals to monitor each stage of the building process more efficiently, ensuring that the wastage of time and resources is minimized. Developing processes that are faster and more efficient,ensuring everything goes as per schedule, and maintaining the quality throughout is the responsibility of a project manager.
Many different types of projects are handled by CAD BIM services, each with different sets of requirements and conditions.A project manager should consider a few important things carefully while approaching a new project, some of these aspects are discussed below.
- Workflows
BIM is not just a program or a 3D model, it’s a database containing virtually every information about the project, including all the model elements. BIM workflows allow for a dynamic and synchronized approach to project management that ensures that all the information can be accessed easily by all the stakeholders, including the clients. The project manager must ensure that the project stays well within the guidelines established by various stakeholders by making full use of model creation, visualization and simulation utilities.
- Specific roles for team members
It’s the responsibility of the project manager to choose suitable team members and assign specific roles to them throughout the project lifecycle. Some key factors to be considered for choosing the members are modeling proficiency, technical aptitude and leadership qualities. Similarly, some important factors to be considered while working with extended teams placed at different locations are design of the model, projected model size and work splits etc.
- Deliverables
You also must consider the project deliverables. BIM modifies the traditional phases to define the activities associated with a project in a more effective way.The design phase,for example, should be much longer to take all the necessary decisions, but documentation phase can be kept much shorter as all details are already finalized in a BIM model.
CAD BIM services providers employ a new-age system that has the potential to take the building industry into the next generation. One can make the project management more efficient and productive by taking good care of certain crucial factors mentioned above.