The cost of construction has risen astronomically in the recent times; it makes the job of The AEC Associates Architectural CAD Drafting firms most challenging. Even the slightest of errors on the part of Architectural CAD drafting Services could prove very costly to their clients in terms of loss of money and time.

 Site Survey For Architectural CAD Drafting
Importance Of Site Survey For Architectural CAD Drafting


Site survey:

Architects and other construction industry professionals cannot afford to undermine the importance of on-site survey for various reasons. Firstly, a proper survey provides so many vital inputs like sun and wind direction, location of trees and slope of the ground etc; inputs that often determine the basis of the building design. Secondly, an accurate site survey helps avoid so many unnecessary errors, errors that might be a cause of embarrassment for the company in future.

The existing drawings:

Many clients provide the existing drawings or site maps to Architectural CAD drafting team that are either prepared by their previous architect or are supplied by the authorities. However, relying solely on these drawings sometimes proves very costly; it is always prudent and safe for the design team to verify the accuracy of these drawings by conducting their own site survey before undertaking the design of any proposed building. This is just as important while undertaking a renovation or addition job. Overlooking this aspect could ruin the whole design or face problems with the building authorities while acquiring sanction letters.

On-site survey gives an exact idea of the topography of the site, various resources available nearby, and the adjacent structures and locations. These inputs can make the design more interesting and better suited to the needs of the client and the surroundings.

On-site survey should be treated as an integral part of the design process by Architectural CAD drafting team. Proper time and effort should be invested on the job to ensure that there are no anomalies in the existing maps and drawings and that an actual and accurate data is provided to the design team.